Septic
Septic System Replacement
Replacing a septic system starts with the ground, not the tank. A licensed designer tests the soil and draws a system that fits the lot, the state approves the plan, then the crew takes out the old system and puts in the new tank and leach field. The design and permit usually take longer than the dig.
What the job includes
- Soil test and system design. A licensed designer tests the soil and draws the system for your lot.
- State approval. The design goes to RIDEM for approval before any digging.
- Removing the old system. The old tank is pumped, then removed or filled as the permit says.
- New tank and leach field. Set to the approved design and inspected before it is covered.
- Backfill and grading. The site is backfilled and graded once the inspection passes.
How it goes
- 1Send your town, photos of the yard and any old septic plans or inspection report.
- 2Book the soil test and design. An installation price needs the finished design.
- 3The design goes to the state for approval.
- 4The crew installs the system, it is inspected, and the yard is graded.
What to send first
Your town, photos of the yard where the system is, and any old septic plans, pumping records or inspection report.
Common questions
Why can't I get an installation price before the design?
The design sets the system type, its size and where it goes, which is most of the cost. Until the soil is tested, any price is a guess.
Do I need a permit to replace a septic system in Rhode Island?
Yes. A new or replacement system needs RIDEM approval of its design before work starts, and an inspection before it is covered.
Will my yard be dug up?
The work area will be. Ask your pro how they handle access, soil piles and the final grade before the job starts.