Landscaping
Paver Patios, Walkways & Driveways
A paver patio, walkway or driveway lasts as long as what is under it. The ground is dug out, a gravel base is built and compacted deep enough for what will sit on it, and the pavers are laid tight inside an edge that holds them. Pavers that are already down can be washed, re-sanded and sealed to look close to new.
What the job includes
- Design and layout. The shape, the pavers and their color, and where rain will run off.
- Digging out. Soil taken out to the depth the base needs, and the old surface if there is one.
- The base. Compacted gravel, deeper under a driveway than a patio; open stone under permeable pavers.
- Laying the pavers. Set on a bedding layer, cut to fit, and held with edging.
- The joints. Swept with polymeric sand and compacted.
- Cleaning and sealing. For older pavers: power washed, re-sanded and sealed.
How it goes
- 1Send your town, photos of the space and roughly how big it is.
- 2A pro visits to measure, show you pavers and lay out the design.
- 3Agree the design and the price.
- 4The crew digs out, builds the base and lays the pavers.
What to send first
Your town, photos of the space, its rough size, and any paver styles you like.
Common questions
What is a permeable paver driveway?
Pavers with wider joints over a deep bed of open stone, so rain soaks into the ground instead of running off. It suits a lot where water pools or runs toward the house.
How long do pavers last?
Decades, on a good base. Pavers that sink or heave almost always have a base problem, not a paver problem.
Should I seal my pavers?
It is optional. Sealing deepens the color, resists stains and helps keep the joint sand in place. It is redone every few years.
What warranty should I ask for?
Two: the pro’s on their work, and the paver maker’s on the pavers. Ask how long each lasts and what it covers.