Site Work for a New Home
General Contractor
Site Work for a New Home
Before a new house goes up, the lot has to be ready: cleared, dug for the foundation, trenched for water and power, and graded so water runs away from the house. One site crew can carry the job from the first tree to the final grade, working to your builder's plans.
What the job includes
- Clearing. Trees, stumps and brush where the house, drive and yard will go.
- Foundation excavation. Dug to the plan and the builder's schedule.
- Utility trenches. Water, sewer or septic lines, electric and conduit.
- Backfill and rough grading. Around the foundation once it is ready.
- Driveway base. Gravel base for the drive.
- Final grade and loam. Ready for seed or sod.
How it goes
- 1Send the address, the site plan and the builder's schedule.
- 2Walk the lot with the site crew.
- 3Agree the scope and order of work with your builder.
- 4The crew clears, digs, trenches and grades in step with the build.
What to send first
The address, the site plan and the builder's schedule.
Common questions
What do I need before site work starts?
A site plan, the permits your town requires, and underground utilities marked: call 811 (Dig Safe) before any digging.
Who coordinates with the builder?
Agree it up front. Usually the builder schedules the site crew around the foundation pour and framing.
Does site work include the septic system?
It can. A septic system needs its own design and state approval; see the septic system replacement Kit.